The Community Radio Station covering Central-Southern Dorset, run by volunteers and not-for-profit

KeeP 106 logo
listen-live-online-button.-Player-opens-in-a-new-window
Dorchester from The Keep
Queen Mother Square
Poundbury Fountain
Dorchester Borough Gardens
Custom House Quay, Weymouth, England
Chesil Beach from Portland
The area north of Dorchester
Heritage Open Days - Maumbury Rings event 180921
Thomas Hardy statue
Keep Military Museum
Dorset Museum front exterior
Shire Hall front
In the damp conditions the beacon is finally alight after a couple of attempts
Dorchester from The Keep
Queen Mother Square
Poundbury Fountain
Dorchester Borough Gardens
Custom House Quay, Weymouth, England
Chesil Beach from Portland
The area north of Dorchester
HOD Maumbury Rings 180921 04
Thomas Hardy statue
Keep Military Museum 4
Dorset Museum front exterior 270522
Shire Hall front
Beacon 2023 01
previous arrow
next arrow
Exit full screenEnter Full screen
The Community Radio Station covering Central-Southern Dorset, run by volunteers and not-for-profit

Beach work set to start in Weymouth

Work to replace sand on parts of Weymouth beach and improve flood protection will begin next week. (26/11)

Dorset Council will use dump trucks and excavators to move sand from the southern end of the beach, near the Peninsula, to the northern end near Greenhill.
The sand will be moved from the lower part of the beach. This means there will be no shortage of sand or loss of amenity near the Peninsula. The sand will then be placed beneath the shingle at Greenhill, so the character of the beach will not be changed.

The work is expected to take two days and is being done in co-ordination with Weymouth Town Council.

Rob Clarke, Dorset Council Engineer, said: “The sand we are moving has naturally worked its way along the beach. We are simply moving it back to provide better protection to more vulnerable sections of the beach wall.

“This will raise the beach level and create a wider crest. This is a more cost effective way of protecting the promenade until we can deliver a more permanent solution”

The works are being carried out in accordance with the Beach Management Plan.

Image relevant to this news item