The Community Radio Station covering Central-Southern Dorset, run by volunteers and not-for-profit

KeeP 106 logo
listen-live-online-button.-Player-opens-in-a-new-window
Queen Mother Square
Dorchester Borough Gardens
Custom House Quay, Weymouth, England
Chesil Beach from Portland
Heritage Open Days - Maumbury Rings event 180921
Thomas Hardy statue
Keep Military Museum
Dorset Museum front exterior
Shire Hall front
In the damp conditions the beacon is finally alight after a couple of attempts
Weymouth Eye 1
RNLI mural 01
Queen Mother Square
Dorchester Borough Gardens
Custom House Quay, Weymouth, England
Chesil Beach from Portland
HOD Maumbury Rings 180921 04
Thomas Hardy statue
Keep Military Museum 4
Dorset Museum front exterior 270522
Shire Hall front
Beacon 2023 01
Weymouth Eye 1 280425
RNLI mural 01
previous arrow
next arrow
Exit full screenEnter Full screen
The Community Radio Station covering Central-Southern Dorset, run by volunteers and not-for-profit

Milestone reached in Emergency Department refurbishment

Refurbishment of Dorset County Hospital’s Emergency Department is progressing well, with two new clinical areas now in use.

The Trust received one-off funding from NHS England of £15million, as part of a drive to upgrade several Emergency Departments across the country.

The scheme aims to enhance infection prevention and control measures and reduce the risk of ‘corridor care’ by increasing the capacity of the resuscitation and treatment areas.

Dorset County Hospital is developing plans to expand over the next five years, which include building a new Emergency Department and Critical Care Unit on site. The refurbishment work that is underway will help provide additional space in the coming months and pave the way for the new building.

The alterations, carried out by Willmott Dixon Construction, include two extensions – one in the courtyard at the rear of ED and one at the front entrance – as well as refurbishment of the existing ED. It will provide a new entrance and waiting area, larger resuscitation rooms, bigger cubicles and many other improvements.

Two new areas are now in use, offering bigger cubicles, more space and new medical equipment. Work is still underway and being carried out in stages to minimise disruption and make sure the ED remains open 24/7.

Dr Steve Meek, Emergency Department Clinical Lead, told KeeP 106:

“Every year our Emergency Department sees more than double the number of people it was built for, so we are excited about the developments that are happening on site over the coming months and in the next few years.

“It’s great to be able to start to use some of our new clinical space. It will give us some much-needed extra room and better facilities to care for our patients. Construction work is ongoing but patient care, safety and seeing people in a timely manner remain our top priorities. I’d like to thank patients and staff for bearing with us while these improvements are made.”

The refurbishment is due to be completed this summer.

Image relevant to this news item
Image relevant to this news item
Image relevant to this news item